Violation Detail
Standard Cited: 19260451 E05 I General requirements.
Inspection Nr: 1076924.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,570.00
Current Penalty: $2,677.50
Issuance Date: 11/05/2015
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 12/03/2015
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 11/11/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/11/2015 | $2,677.50 | 12/03/2015 | Serious | |
| Penalty | Z: Issued | 11/05/2015 | $3,570.00 | 12/03/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(e)(5)(i): Ramps and walkways 6 feet (1.8 m) or more above lower levels did not have guardrail systems that comply with subpart M of this part -- Fall Protection: a) Speedwell Forge Lake Dam; Front Side of Concrete Wall Form - Employees using a walkway to access a form scaffold were not protected by a guard rail system and were exposed to fall hazards up to 9 feet - 1 inch to the ground below, on or about July 10, 2015. b) Speedwell Forge Lake Dam; Rear Side of Concrete Wall Form - Employees using a walkway to access a form scaffold were not protected by a guard rail system and were exposed to fall hazards up to 10 feet - 10 inches to the ground below, on or about July 10, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.