Violation Detail
Standard Cited: 19260552 C16 Material hoists, personnel hoists, and elevators.
Inspection Nr: 1070688.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 12/04/2015
Nr Instances: 2
Nr Exposed: 8
Abatement Date: 01/25/2016
Gravity: 10
Report ID: 0134000
Contest Date: 12/23/2015
Final Order: 04/20/2016
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/20/2016 | $7,000.00 | 01/25/2016 | Serious | |
| Penalty | C: Contested | 02/08/2016 | $7,000.00 | 01/25/2016 | Serious | |
| Penalty | Z: Issued | 12/04/2015 | $7,000.00 | 01/25/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.552(c)(16): The employer did not ensure that all personnel hoists used by employees were constructed of materials and components which meet the specifications for materials, construction, safety devices, assembly, and structural integrity as stated in the American National Standard A10.4-1963, Safety Requirements for Workmen's Hoists. Location - 399 Revolution Drive, Somerville, MA: On or about 6/11/2015, the employer failed to ensure that all personnel hoists being erected were constructed of materials and components which meet the specifications for materials, construction, safety devices, assembly, and structural integrity as stated in the American National Standard A10.4-1963, Safety Requirements for Workmen's Hoists.