Violation Detail
Standard Cited: 19100219 M02 I Mechanical power-transmission apparatus.
Inspection Nr: 1070467.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,000.00
Current Penalty: $3,000.00
Issuance Date: 09/09/2015
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 10/07/2015
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 09/21/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/21/2015 | $3,000.00 | 10/07/2015 | Serious | |
Penalty | Z: Issued | 09/09/2015 | $5,000.00 | 10/07/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.219(m)(2)(i): Expanded metal, sheet or perforated metal, and wire mesh was not securely fastened to frame. (a) Truck Receiving/Loading area on the North end, the center auger for unloading the bin just north of the main leg, next to the rail road, had a broken hinge and latch on the guard and was held together with a bungee cord which allowed it to be readily removable by the operator. This exposed employees to in-running nip points. (b) Truck Receiving/Loading area on the North end, the center auger for unloading the bin just south of the main leg, next to the rail road, had a broken latch on the guard and was held together with a bungee cord which allowed it to be readily removable by the operator. This exposed employees to in-running nip points.