Violation Detail
Standard Cited: 19260251 A01 Rigging equipment for material handling.
Inspection Nr: 1067686.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $5,600.00
Issuance Date: 11/19/2015
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/09/2015
Gravity: 10
Report ID: 0626600
Contest Date: 12/02/2015
Final Order: 07/25/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 07/29/2016 | $7,000.00 | 12/09/2015 | Serious | |
Penalty | R: Review Commission | 07/25/2016 | $5,600.00 | 12/09/2015 | Serious | |
Penalty | Z: Issued | 11/19/2015 | $7,000.00 | 12/09/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.251(a)(1): Defective rigging equipment was not removed from service: The employer does not remove defective equipment from service. This violation occurred on or about June 2, 2015 and times prior thereto, at or near 5610 W. Davis St. in Conroe, TX, where employees were exposed to a struck-by hazard when lifting 23,000-pound concrete culverts with a defective lifting hook. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that defective rigging equipment is removed from service.