Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 106521297
Citation: 01001
Citation Type: Other
Abatement Status: X
Initial Penalty: $1,875.00
Current Penalty:
Issuance Date: 11/01/2010
Nr Instances: 1
Nr Exposed: 100
Abatement Date: 11/19/2010
Gravity: 05
Report ID: 0418100
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/23/2010 | 11/19/2010 | Other | ||
| Penalty | Z: Issued | 11/01/2010 | $1,875.00 | 11/19/2010 | Serious |
Translate