Violation Detail
Standard Cited: 19100024 G Step bolts and manhole steps.
Inspection Nr: 1064052.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $3,400.00
Current Penalty: $2,380.00
Issuance Date: 09/11/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/17/2015
Gravity:
Report ID: 0316400
Contest Date: 10/13/2015
Final Order: 02/04/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 02/04/2016 | $2,380.00 | 09/17/2015 | Other | |
| Penalty | C: Contested | 10/19/2015 | $3,400.00 | 09/17/2015 | Serious | |
| Penalty | Z: Issued | 09/11/2015 | $3,400.00 | 09/17/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.24(g): Stairway platforms were not at least the width of the stairway and 30 inches in length measured in the direction of travel: (a) Boxing Area: Employees have to step up onto a 4 1/4 inch by 32 1/2 inch lip on the number 70, Singer Work Factory s/n 5626, boxing machine to fill the glue box. The employer did not ensure that the stairway platform was at least the width of the stairway and 30 inches in length measured in the direction of travel, as determined on or about 05/12/2015. ABATEMENT CERTIFICATION REQUIRED
Translate