Violation Detail
Standard Cited: 19100036 B08 Design and construction requirements for exit routes.
Inspection Nr: 106146855
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $250.00
Current Penalty: $150.00
Issuance Date: 05/22/1990
Nr Instances: 1
Nr Exposed: 14
Abatement Date: 08/01/1990
Gravity: 05
Report ID: 0524200
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/12/1990 | $150.00 | 08/01/1990 | Serious | |
| Penalty | Z: Issued | 05/22/1990 | $250.00 | 06/26/1990 | Serious |
Translate