Violation Detail
Standard Cited: 19100268 J03 Telecommunications.
Inspection Nr: 1050395.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $1,540.00
Issuance Date: 09/18/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/16/2015
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 10/05/2015
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/05/2015 | $1,540.00 | 10/16/2015 | Serious | |
| Penalty | Z: Issued | 09/18/2015 | $2,800.00 | 10/02/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.268(j)(3): Vehicle-mounted elevating and rotating work platforms were operated with conductive parts of the equipment closer to exposed energized power lines than the clearances set forth in Table R-2 of this section: On or about April 1, 2015, the conductive basket of the Genie extensible boom aerial lift (Serial No. 18014-165) was operated closer to exposed 7200 volt energized power lines than the 24 inch clearance set forth in Table R-2.