Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1049123.015
Citation: 01001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $4,000.00
Current Penalty: $4,000.00
Issuance Date: 05/01/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity:
Report ID: 0215800
Contest Date:
Final Order: 05/19/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/19/2015 | $4,000.00 | Other | ||
| Penalty | Z: Issued | 05/01/2015 | $4,000.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Warehouse Area, on or about 3/26/2015: Emergency exit door at the north side of the building was locked from the inside with a dead bolt.
Translate