Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1040901.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,600.00
Current Penalty: $2,520.00
Issuance Date: 04/23/2015
Nr Instances: 1
Nr Exposed: 14
Abatement Date: 06/10/2015
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 05/13/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/13/2015 | $2,520.00 | 06/10/2015 | Serious | |
| Penalty | Z: Issued | 04/23/2015 | $3,600.00 | 06/10/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: Employees in the Memory Building (building 1) are exposed to smoke inhalation and burn hazards because an exit door is obstructed by a curtain and shelf.
Translate