Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1022109.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,900.00
Issuance Date: 07/20/2015
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/14/2015
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 08/05/2015
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/05/2015 | $4,900.00 | 08/14/2015 | Serious | |
Penalty | Z: Issued | 07/20/2015 | $7,000.00 | 08/07/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations: On or about January 28, 2015 at the jobsite the employer failed to have an engineering survey performed prior to commencing demolition operations exposing employees to struck-by hazards.