Violation Detail
Standard Cited: 19100119 D Process safety management of highly hazardous chemicals.
Inspection Nr: 1019650.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/19/2017 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 07/09/2015
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 10
Report ID: 0626700
Contest Date: 07/30/2015
Final Order: 06/05/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/05/2017 | $7,000.00 | 06/19/2017 | Serious | |
Penalty | C: Contested | 07/30/2015 | $7,000.00 | 08/25/2015 | Serious | |
Penalty | Z: Issued | 07/09/2015 | $7,000.00 | 08/25/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d): The employer did not complete a compilation of written process safety information pertaining to the equipment in the process. a) This violation was most recently observed on or about January 12, 2015 in the Herbicide Business Unit (HBU) at DuPont Plant located in La Porte, Texas when the employer failed to document and maintain the Process Safety Information (PSI) including the materials of construction for the following process piping: 1. Line # 2" 2511 / 2" 2512 (Extractor Pump Tank Overhead to Vacuum Stripper Column) 2. Line # 2" 3615/ 2" 3615A (Vacuum Stripper Seal Pot to F3455 Stripped S/T) 3. Line # 3" 3204/2" 3205 (Crystallizer Outlet to Slurry Hold Tank) 4. Line # 3" 3151 (Preheater to Concentrator) b) This violation was most recently observed on or prior to January 12, 2015 in the Hydrogen Fluoride Unit (HF) at DuPont Plant located in La Porte, Texas when the employer failed to document and maintain the Process Safety Information (PSI) including the materials of construction for the following process piping: Line # 1526, 2" From Drip Acid Tank Vent to Middle Primary Gas Cooler.