Violation Detail

Standard Cited: 19261404 D01 I  

Inspection Nr: 1017438.015

Citation: 01001

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $7,000.00

Issuance Date: 06/01/2015

Nr Instances: 1

Nr Exposed: 1

Abatement Date: 12/09/2015

Gravity: 10

Report ID: 0524530

Contest Date: 06/24/2015

Final Order: 02/01/2016

Related Event Code (REC): A

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 02/01/2016 $7,000.00 12/09/2015 Serious  
Penalty C: Contested 06/24/2015 $7,000.00 06/05/2015 Serious  
Penalty Z: Issued 06/01/2015 $7,000.00 06/05/2015 Serious  

Text For Citation: 01 Item/Group: 001 Hazard:

29 CFR 1926.1404(d)(1)(i): Before commencing assembly/disassembly operations, the A/D director did not ensure that the crew members understood all of their tasks: The A/D director did not ensure that the crew members understood all of their tasks before commencing assembly/disassembly operations on a Grove Lattice Boom Crane, Model #84150G.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.