Violation Detail
Standard Cited: 19100269 P03 Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1016800.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 02/27/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/18/2015
Gravity: 10
Report ID: 0626600
Contest Date: 04/06/2015
Final Order: 08/17/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 08/17/2015 | $7,000.00 | 03/18/2015 | Serious | |
| Penalty | C: Contested | 06/17/2015 | $7,000.00 | 03/18/2015 | Serious | |
| Penalty | Z: Issued | 02/27/2015 | $7,000.00 | 03/18/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(p)(3): Mechanical equipment used to lift or move lines or other material was not used within its maximum load rating and other design limitations for the conditions under which the mechanical equipment was being used: "On or about January 6, 2015, the Caterpillar 950K wheeled loader with forklift tine attachment was used to hold and guide a wooden power pole as it was being cut and felled under conditions exposing an employee to struck-by hazard."