Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1010174.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $3,700.00
Issuance Date: 05/20/2015
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 06/16/2015
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 06/12/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/12/2015 | $3,700.00 | 06/16/2015 | Serious | |
| Penalty | Z: Issued | 05/20/2015 | $7,000.00 | 06/16/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard were being followed: On November 22, 2014, the employer had not conducted periodic inspections of the energy control procedures for equipment including, but not limited to, the 9-inch press line.