Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1005455.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,400.00
Current Penalty: $1,000.00
Issuance Date: 04/03/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 05/06/2015
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 04/28/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/28/2015 | $1,000.00 | 05/06/2015 | Serious | |
Penalty | Z: Issued | 04/03/2015 | $4,400.00 | 05/06/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Throughout the facility; Exit doors were equipped with sliding locks and handles requiring more than one action to exit the facility.