Violation Detail
Standard Cited: 19100036 B02 Design and construction requirements for exit routes.
Inspection Nr: 100488535
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $450.00
Current Penalty: $450.00
Issuance Date: 02/22/1988
Nr Instances: 2
Nr Exposed: 30
Abatement Date: 04/07/1988
Gravity:
Report ID: 0214200
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate