Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1003527.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,620.00
Issuance Date: 04/16/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/31/2015
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 05/07/2015
Related Event Code (REC):
Emphasis:
Failure to Abate | |||||||
---|---|---|---|---|---|---|---|
Activity Nr | Issuance | Penalty | Contest | Final Order | |||
1127396 | 08/01/2016 | $7,350.00 | 08/24/2016 |
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
FTA | I: Informal Settlement | 08/24/2016 | $7,350.00 | 09/19/2016 | 1127396.015 | |
FTA | Z: Issued | 08/01/2016 | $14,700.00 | 08/05/2016 | 1127396.015 | |
Penalty | I: Informal Settlement | 05/07/2015 | $4,620.00 | 07/31/2015 | Serious | |
Penalty | Z: Issued | 04/16/2015 | $7,000.00 | 05/12/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) Employees engaged in the set-up of machines and equipment, including SL6 and SL8 lines, do not utilize hazardous energy control procedures (lockout) during set-up operations. (b) Maintenance activities of short duration are not always conducted using established energy control procedures.