Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 1002039
Citation: 01001
Citation Type: Serious
Abatement Status: A
Initial Penalty: $810.00
Current Penalty: $405.00
Issuance Date: 05/22/1990
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 05/25/1990
Gravity: 09
Report ID: 0215600
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/14/1990 | $405.00 | 05/25/1990 | Serious | |
Penalty | Z: Issued | 05/22/1990 | $810.00 | 05/25/1990 | Serious |