Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1000991.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,900.00
Issuance Date: 03/06/2015
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 04/20/2015
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 03/31/2015
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/31/2015 | $4,900.00 | 04/20/2015 | Serious | |
| Penalty | Z: Issued | 03/06/2015 | $7,000.00 | 03/12/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means. On or about October 15, 2014 the employer did not protect employees working in close proximity to electrical power circuits from exposure to electrical current by ensuring that circuits were de-energized.
Translate