Violation Detail
Standard Cited: 19100036 H02 Design and construction requirements for exit routes.
Inspection Nr: 1000129.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,400.00
Current Penalty: $4,000.00
Issuance Date: 04/08/2015
Nr Instances: 3
Nr Exposed: 205
Abatement Date: 08/31/2015
Gravity: 5
Report ID: 0215800
Contest Date: 04/28/2015
Final Order: 09/14/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 09/14/2015 | $4,000.00 | 08/31/2015 | Serious | |
Penalty | C: Contested | 04/30/2015 | $4,400.00 | 04/18/2015 | Serious | |
Penalty | Z: Issued | 04/08/2015 | $4,400.00 | 04/18/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(h)(2): Outdoor exit route was not covered where snow or ice was likely to accumulate. (Exception: Not required where employer can demonstrate that snow or ice will be removed before it can present a hazard): a) Exit 5, on or about 12/12/14: An outside exit route from production area was not kept clear following significant accumulations of snow. b) Exit 6, on or about 12/12/14: An outside exit route from production area was not kept clear following significant accumulations of snow. c) Exit from waste storage area on Dio way, on or about 12/12/14: An outside exit from waste storage area was not kept clear following significant accumulations of snow. abatement certification must be submitted for this item.