Powered by GoogleTranslate

Inspection Detail

Inspection: 315838391 - Fraizer Masonry Corporation

Inspection Information - Office: San Diego Area Office

 

Inspection Nr: 315838391
Report ID: 0936200
Date Opened: 08/15/2011

Site Address:
Fraizer Masonry Corporation
New Main Exchange Project
Camp Pendleton, CA 92055

Mailing Address:
5841 Edison Place, Suite 100, Carlsbad, CA 92008

Union Status: NonUnion

SIC:1741

NAICS: 238140/Masonry Contractors


Inspection Type: Prog Related

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 08/15/2011

Planning Guide: Safety-Construction

Emphasis: L:Progcon, S:Amputations, S:Commercial Constr, S:Electrical, S:Fall From Height, S:Hispanic, S:Noise, S:Powered Ind Vehicle, S:Silica, S:Struck-By

Case Closed: 04/05/2013


Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $1,822 $0 $0 $0 $0 $1,822
Current Penalty $0 $0 $0 $1,800 $0 $1,800
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 19260095 A 08/24/2011 08/29/2011 $1,800 $1,822 $0 09/12/2011 F - Formal Settlement  
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.