Inspection Detail
Inspection: 310104609 - Ma & Pa S Construction
Inspection Information - Office: Dosh Tumwater Service Location, Tumwater, Wa
Site Address:
Ma & Pa S Construction
Lot 829 Switchback Loop Horizon Pointe
Lacey, WA 98513
Mailing Address:
16042 143rd Ave Se, Yelm, WA 98597
Union Status: NonUnion
SIC:1751
NAICS: 238130/Framing Contractors
Inspection Type: Planned
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/05/2006
Emphasis: L:Constr
Case Closed: 10/01/2006
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 2 | 2 | 6 | ||
| Current Violations | 2 | 2 | 2 | 6 | ||
| Initial Penalty | $200 | $0 | $2,200 | $0 | $0 | $2,400 |
| Current Penalty | $200 | $0 | $2,200 | $0 | $0 | $2,400 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Repeat | 15524510 | 08/08/2006 | 07/04/2006 | $2,000 | $2,000 | $0 | - | ||
| 2. | 01001B | Serious | 1552450502 | 08/08/2006 | 07/04/2006 | $0 | $0 | $0 | - | ||
| 3. | 01002 | Repeat | 87640050 | 08/08/2006 | 07/04/2006 | $200 | $200 | $0 | - | ||
| 4. | 02001 | Serious | 1550050505 A | 08/08/2006 | 07/04/2006 | $100 | $100 | $0 | - | ||
| 5. | 02002 | Serious | 1550047703 A 02 | 08/08/2006 | 07/04/2006 | $100 | $100 | $0 | - | ||
| 6. | 03001 | Other | 1550012001 | 08/08/2006 | 07/04/2006 | $0 | $0 | $0 | - | ||
| 7. | 03002 | Other | 80015020 | 08/08/2006 | 07/04/2006 | $0 | $0 | $0 | - |
Translate