Inspection Detail
Inspection: 1901271 - Stotler Construction
Inspection Information - Office: Corpus Christi Area Office
Site Address:
Stotler Construction
300 Marine Drive
Harlingen, TX 78550
Mailing Address:
Po Drawer M, Pharr, TX 78577
Union Status: NonUnion
SIC:1542
NAICS: 0
Inspection Type: Planned
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/17/1985
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 05/20/1985
Back to Top
Translate