Inspection Detail
Inspection: 1711767.015 - Three Phase Line Construction, Inc.
Inspection Information - Office: Bridgeport Area Office
Site Address:
Three Phase Line Construction, Inc.
1 Sandbar Road Near Structure 266l
Monroe, CT 06468
Mailing Address:
35e Industrial Way Suite 202, Rochester, NH 03867
Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 11/20/2023
Emphasis: L:Crane
Case Closed: 03/28/2025
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 2104927 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 3 | 3 | ||||
Current Violations | 1 | 1 | ||||
Initial Penalty | $41,480 | $0 | $0 | $0 | $0 | $41,480 |
Current Penalty | $0 | $0 | $0 | $16,131 | $0 | $16,131 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19261408 A02 | 01/23/2024 | 02/16/2024 | $0 | $16,131 | $0 | 02/09/2024 | F - Formal Settlement | Citation has been deleted. |
2. | 01001B | Serious | 19261408 G01 I E | 01/23/2024 | 02/16/2024 | $0 | $0 | $0 | 02/09/2024 | F - Formal Settlement | Citation has been deleted. |
3. | 01002A | Other | 19261408 B04 II D | 01/23/2024 | 02/16/2024 | $16,131 | $16,131 | $0 | 02/09/2024 | F - Formal Settlement | |
4. | 01002B | Serious | 19261408 G02 | 01/23/2024 | 02/16/2024 | $0 | $0 | $0 | 02/09/2024 | F - Formal Settlement | Citation has been deleted. |
5. | 01003 | Serious | 19261427 C01 | 01/23/2024 | 02/16/2024 | $0 | $9,218 | $0 | 02/09/2024 | F - Formal Settlement | Citation has been deleted. |