Inspection Detail
Quick Link Reference
1118813.015 | 1118705.015 | 1109353.015 | 1093825.015 | 1081604.015 | 1013610.015 | 1009139.015 | 996709.015Inspection: 1118813.015 - Park Side Construction Builders Corp.
Inspection Information - Office: Manhattan Area Office
Site Address:
Park Side Construction Builders Corp.
215 Chrystie Street
New York, NY 10002
Mailing Address:
213-33 39th Avenue Suite 330, Bayside, NY 11361
Union Status: NonUnion
SIC:
NAICS: 238110/Poured Concrete Foundation and Structure Contractors
Inspection Type: Planned
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/20/2016
Emphasis: P:Localtarg, L:Fall, L:Localtarg
Case Closed: 11/17/2017
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 1 | 3 | 4 | |||
Current Violations | 1 | 3 | 4 | |||
Initial Penalty | $3,080 | $0 | $32,340 | $0 | $0 | $35,420 |
Current Penalty | $2,257 | $0 | $23,610 | $0 | $0 | $25,867 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260502 I03 | 06/03/2016 | $2,257 | $3,080 | $0 | 01/27/2017 | F - Formal Settlement | ||
2. | 02001 | Repeat | 19260451 B01 | 06/03/2016 | $7,870 | $10,780 | $0 | 01/27/2017 | F - Formal Settlement | ||
3. | 02002 | Repeat | 19260451 E01 | 06/03/2016 | $7,870 | $10,780 | $0 | 01/27/2017 | F - Formal Settlement | ||
4. | 02003 | Repeat | 19260451 G01 VII | 06/03/2016 | $7,870 | $10,780 | $0 | 01/27/2017 | F - Formal Settlement |
Inspection: 1118705.015 - Park Side Construction, Inc.
Inspection Information - Office: Manhattan Area Office
Site Address:
Park Side Construction, Inc.
20 W 40th Street
New York, NY 10018
Mailing Address:
213-33 39th Avenue, Suite 330, Bayside, NY 11361
Union Status: NonUnion
SIC:
NAICS: 238110/Poured Concrete Foundation and Structure Contractors
Inspection Type: Prog Related
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/12/2016
Emphasis: P:Localtarg, L:Fall, L:Localtarg
Case Closed: 11/17/2017
Type | Activity Nr | Safety | Health |
---|---|---|---|
Inspection | 1118684 | Yes | |
Inspection | 1118942 | Yes | |
Inspection | 1118925 | Yes | |
Inspection | 1118957 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 1 | 1 | ||||
Current Violations | 1 | 1 | ||||
Initial Penalty | $0 | $0 | $6,160 | $0 | $0 | $6,160 |
Current Penalty | $0 | $0 | $4,497 | $0 | $0 | $4,497 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Repeat | 19260028 A | 04/05/2016 | $4,497 | $6,160 | $0 | 01/27/2017 | F - Formal Settlement |
Inspection: 1109353.015 - Park Side Construction
Inspection Information - Office: Manhattan Area Office
Site Address:
Park Side Construction
116 W 58th St
New York, NY 10019
Mailing Address:
213-33 39th Ave, Suite 330, Bayside, NY 11361
Union Status: NonUnion
SIC:
NAICS: 238110/Poured Concrete Foundation and Structure Contractors
Inspection Type: Referral
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 11/19/2015
Emphasis: L:Fall
Case Closed: 11/20/2015
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1043040 | Yes | |
Inspection | 1111488 | Yes |
Inspection: 1093825.015 - Park Side Construction Llc
Inspection Information - Office: Manhattan Area Office
Site Address:
Park Side Construction Llc
9 Orchard Street
New York, NY 10002
Mailing Address:
166-08 24th Road, Whitestone, NY 11357
Union Status: NonUnion
SIC:
NAICS: 238110/Poured Concrete Foundation and Structure Contractors
Inspection Type: FollowUp
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 09/23/2015
Emphasis: P:Fall, L:Fall
Case Closed: 10/02/2015
Type | Activity Nr | Safety | Health |
---|---|---|---|
Inspection | 1009139 | Yes |
Inspection: 1081604.015 - Park Side Construction Contractors
Inspection Information - Office: Manhattan Area Office
Site Address:
Park Side Construction Contractors
350 W 40th St
New York, NY 10018
Mailing Address:
166 08 24th Rd, Whitestone, NY 11357
Union Status: NonUnion
SIC:
NAICS: 238110/Poured Concrete Foundation and Structure Contractors
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/31/2015
Emphasis:
Case Closed: 11/17/2017
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1006345 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 2 | 2 | ||||
Current Violations | 2 | 2 | ||||
Initial Penalty | $6,930 | $0 | $0 | $0 | $0 | $6,930 |
Current Penalty | $5,059 | $0 | $0 | $0 | $0 | $5,059 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260404 F06 | 11/13/2015 | $2,810 | $3,850 | $0 | 01/27/2017 | F - Formal Settlement | ||
2. | 01002 | Serious | 19260416 E01 | 11/13/2015 | $2,249 | $3,080 | $0 | 01/27/2017 | F - Formal Settlement |
Inspection: 1013610.015 - Park Side Construction
Inspection Information - Office: Manhattan Area Office
Site Address:
Park Side Construction
101 West 28th Street
New York, NY 10001
Mailing Address:
166-08 24th Road, Whitestone, NY 11357
Union Status: NonUnion
SIC:
NAICS: 238110/Poured Concrete Foundation and Structure Contractors
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 12/10/2014
Emphasis: L:Fall
Case Closed: 01/20/2016
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 926894 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 1 | 1 | ||||
Current Violations | 1 | 1 | ||||
Initial Penalty | $5,390 | $0 | $0 | $0 | $0 | $5,390 |
Current Penalty | $5,390 | $0 | $0 | $0 | $0 | $5,390 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260451 G02 | 04/24/2015 | $5,390 | $5,390 | $0 | Z - Issued |
Inspection: 1009139.015 - Park Side Construction Llc.
Inspection Information - Office: Manhattan Area Office
Site Address:
Park Side Construction Llc.
9 Orchard Street
New York, NY 10002
Mailing Address:
166-08 24th Road, Whitestone, NY 11357
Union Status: NonUnion
SIC:
NAICS: 238110/Poured Concrete Foundation and Structure Contractors
Inspection Type: Unprog Rel
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/27/2014
Emphasis: L:Fall
Case Closed: 11/17/2017
Type | Activity Nr | Safety | Health |
---|---|---|---|
Inspection | 1009119 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 4 | 4 | ||||
Current Violations | 4 | 4 | ||||
Initial Penalty | $19,600 | $0 | $0 | $0 | $0 | $19,600 |
Current Penalty | $14,308 | $0 | $0 | $0 | $0 | $14,308 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260451 B01 | 04/24/2015 | $3,577 | $4,900 | $0 | 01/27/2017 | F - Formal Settlement | ||
2. | 01002 | Serious | 19260451 E01 | 04/24/2015 | $3,577 | $4,900 | $0 | 01/27/2017 | F - Formal Settlement | ||
3. | 01003 | Serious | 19260451 G01 VII | 04/24/2015 | $3,577 | $4,900 | $0 | 01/27/2017 | F - Formal Settlement | ||
4. | 01004 | Serious | 19260703 B01 | 04/24/2015 | 05/13/2015 | $3,577 | $4,900 | $0 | 01/27/2017 | F - Formal Settlement |
Inspection: 996709.015 - Park Side Construction Llc
Inspection Information - Office: Manhattan Area Office
Site Address:
Park Side Construction Llc
326 W 37th Street
New York, NY 10018
Mailing Address:
15018 14th Ave, Whitestone, NY 11357
Union Status: NonUnion
SIC:
NAICS: 238110/Poured Concrete Foundation and Structure Contractors
Inspection Type: Fat/Cat
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 09/23/2014
Emphasis: N:Trench
Case Closed: 03/13/2017
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 912240 | ||
Inspection | 1023547 | Yes | |
Inspection | 1045281 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 3 | 3 | ||||
Current Violations | 1 | 1 | 2 | |||
Initial Penalty | $21,000 | $0 | $0 | $0 | $0 | $21,000 |
Current Penalty | $7,000 | $0 | $0 | $7,000 | $0 | $14,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01002 | Other | 19260651 K01 | 03/20/2015 | 03/26/2015 | $7,000 | $7,000 | $0 | 03/25/2015 | F - Formal Settlement | |
2. | 01004A | Serious | 19260651 I01 | 03/20/2015 | 03/26/2015 | $7,000 | $7,000 | $0 | 03/25/2015 | F - Formal Settlement | |
3. | 01004B | Serious | 19260652 A01 | 03/20/2015 | 03/26/2015 | $0 | $7,000 | $0 | 03/25/2015 | F - Formal Settlement |
Investigation Summary
At approximately 1:30 p.m. on September 23, 2014, an employee was digging with a shovel and pulling wood out from under the foundation wall to prepare for pouring concrete under the wall. Suddenly, the 8,000 pound section of concrete foundation wall tipped over onto the employee. The part of the wall that fell over was a previous concrete repair section that was part of but not securely connected to the rest of the 100 year old building foundation. The employee was crushed and killed. Shoring was not being used and the section that collapsed was the end-corner of the foundation wall and apparently was not tied in at the corner.
Keywords: Crushed, Falling Object, Masonry Wall, Pinned, Struck By, Structural Collapse, Trench
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 996709.015 | 30 | M | Fatality | Construction laborers |