Accident Summary Nr: 692681 - ELECTRIC SHOCK - DIRECT CONTACT WITH POWER LINE IN SUBSTN

Accident Summary Nr: 692681 -- Report ID: 0355112 -- Event Date: 04/17/1987
Inspection NrDate OpenedSICNAICSEstablishment Name
1874847504/17/198773890Craft Machine Works, Inc.

Abstract: A SUPERVISOR FOR A BUSINESS SERVICES FIRM WAS SHOWN A SUBSTATION THAT HAD TO BE PAINTED. HE WAS TOLD BY A REPRESENTATIVE OF THE ELECTRIC UTILITY TO START ON THE STRUCTURE FOR A 34.5-KILOVOLT CIRCUIT, AS THIS CIRCUIT WOULD BE DEENERGIZED AND GROUNDED. HE WAS ALSO SHOWN AN 11-KILOVOLT CIRCUIT AND WAS TOLD NOT TO APPROACH IT BECAUSE IT WOULD BE ENERGIZED ACROSS THE TOP BUS. A FIVE-PERSON CREW WAS ASSIGNED TO PAINT THE STEEL STRUCTURE IN THE SUBSTATION TWO DAYS LATER. WHEN THE CREW ARRIVED AT THE SUBSTATION, THE SUPERVISER, WHO HAD THE INSTRUCTIONS, WAS NOT THERE. ADDITIONALLY, HE HAD NOT COMMUNICATED THESE INSTRUCTIONS TO THE CREW. THE CREW LEADER MISTAKENLY SENT THE CREW TO WORK ON THE STRUCTURE FOR THE ENERGIZED CIRCUIT. ONE OF THE EMPLOYEES STARTED TO WRAP AN INSULATOR ON THE 11-KILOVOLT LINE AND WAS ELECTROCUTED.

Keywords: ELECTRICAL, INSULATOR, ELECTROCUTED, E PTD, SUBSTATION, ELEC UTILITY WORK, PAINTER

Employee Details
Employee # Inspection Nr Age Sex Degree of Injury Nature of Injury Occupation
1 18748475 Fatality Electric Shock Painters, construction and maintenance

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.