Standard Interpretations
RSS Standard Interpretations Subscribe to our RSS Standard Interpretations feed.
Standard Interpretations are letters or memos written in response to public inquiries or field office inquiries regarding how some aspect of or terminology in an OSHA standard or regulation is to be interpreted and enforced by the Agency. These letters provide guidance to clarify the application of an established OSHA standard, policy, or procedure, but they may not, in themselves, establish or revise OSHA policy or procedure or interpret the OSH Act. They must specifically cite the source policy or procedure document they interpret.
- 1926.757 - Acceptability of using extensible boom forklifts to lift steel joist for spreading by hand - 01/23/2003
- 1926.757 - Decision to release the new compliance directive for the steel erection standard in draft form. - 12/21/2001
- 1926.757 - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757 - Field-bolted joist requirements for solid web structural steel members. - 12/15/2003
- 1926.757 - History and background of the Steel Erection Final Rule. - 09/27/2001
- 1926.757(a)(1) - Field-bolted joist requirements for solid web structural steel members. - 12/15/2003
- 1926.757(a)(1) - Interpretation of OSHA standard CFR 1926.757(a)(1) concerning the angle created by two members framing into a column - 02/23/2011
- 1926.757(a)(4) - Applicability of the steel erection standard to repair and installation of metal roofing and roofing accessories. - 11/08/2002
- 1926.757(a)(8) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. - 08/15/2002
- 1926.757(a)(8) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(a)(8)(i) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. - 08/15/2002
- 1926.757(a)(8)(i) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(a)(8)(i) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting. - 11/20/2003
- 1926.757(a)(8)(ii) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. - 08/15/2002
- 1926.757(a)(8)(ii) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(a)(8)(ii) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting. - 11/20/2003
- 1926.757(a)(9) - Fall protection requirements of various construction (1926) standards. - 09/18/2001
- 1926.757(b) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(b)(1) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. - 08/15/2002
- 1926.757(b)(1) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(b)(2) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. - 08/15/2002
- 1926.757(b)(2) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(b)(3) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(c)(1) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(c)(2) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. - 08/15/2002
- 1926.757(c)(2) - Field bolting and welding requirements for steel joist assembly - 10/22/2002
- 1926.757(c)(3) - Corrected Tables A and B for 1926 Subpart R, the Steel Erection Standard. - 12/19/2002
- 1926.757(e)(4) - Applicability of the steel erection standard to repair and installation of metal roofing and roofing accessories. - 11/08/2002