| # | Letters of Interpretation |
|---|---|
| 1 | - 1926.758(f)(3) - Evaluation if moving point-to-point on concrete wall to make initial connections of structural steel is "connecting" work; landing loads on systems-engineered metal building. |
| # | Letters of Interpretation |
|---|---|
| 1 | - 1926.758(f)(3) - Evaluation if moving point-to-point on concrete wall to make initial connections of structural steel is "connecting" work; landing loads on systems-engineered metal building. |