1
|
- 1926.754(c)(1) - Clarification regarding shop installed continuous bent plate in steel erection
|
2
|
- 1926.754(c)(1) - Prohibition of installation of sheer connectors and pour-stop angles to top flange of steel steel beams prior to decking.
|
3
|
- 1926.754(c)(1) - Evaluation of shop-installed angle iron on the top beam flange in Steel Erection.
|
4
|
- 1926.754(c)(1) - "Threaded studs" are prohibited from being installed prior to decking when they project.
|
5
|
- 1926.754(c)(1) - Sheer connector requirements in the steel erection standard to bridge repair/rehabilitation.
|
6
|
- 1926.754(c)(1) - Fall protection requirements for shop-installed shear connectors at 20 feet above ground or a lower level.
|
7
|
- 1926.754(c)(1) - Bridge construction will not be exempted from the sheer connector requirements of 1926.754(c)(1).
|