# Standard Interpretations
1 - 1926.753(e) - Clarification on rigging for hoisting multiple bundles of construction materials
2 - 1926.753(c)(2) - Padded slings/wire rope during steel erection.
3 - 1926.753, 1926.753(c)(2) - Padded slings/wire rope during steel erection.
4 - 1926.753(e) - Whether a multiple lift of pre-cast concrete members is permissible.
5 - 1926.753, 1926.753(e) - Whether a multiple lift of pre-cast concrete members is permissible.
6 - 1926.753 - OSHA requirements applicable to use of the Contex "Magic Arm" below-the-hook lifting device.
7 - 1926.753 - Requirement for a safety latch on a sling hook depends on the activity for which the sling is being used.
8 - 1926.753(d) - Wire rope clips on suspension scaffolds; safety latches on large crane hooks; order of assembly for hanging scaffolds; and horizontal lifeline design.
9 - 1926.753(c)(5) - Applicability of the steel erection standard to repair and installation of metal roofing and roofing accessories.
10 - 1926.753 - Decision to release the new compliance directive for the steel erection standard in draft form.
11 - 1926.753 - History and background of the Steel Erection Final Rule.
12 - 1926.753(d) - Fall protection requirements of various construction (1926) standards.
13 - 1926.753(c)(2) - Fall protection requirements of various construction (1926) standards.
14 - 1926.753(c)(1)(i) - Fall protection requirements of various construction (1926) standards.
15 - 1926.753(a)(4) - Application of CPL 2-1.29, Interim Inspection Procedures during Communication Tower Construction Activities.
16 - 1926.753(c) - Employees must be kept clear of suspended loads, including multiple lift loads.