1
05/06/2019 - 1926.753(e) - Clarification on rigging for hoisting multiple bundles of construction materials
2
03/31/2010 - 1926.753(c)(2) - Padded slings/wire rope during steel erection.
3
03/31/2010
- 1926.753, 1926.753(c)(2) -
Padded slings/wire rope during steel erection.
4
04/03/2009 - 1926.753(e) - Whether a multiple lift of pre-cast concrete members is permissible.
5
04/03/2009
- 1926.753, 1926.753(e) -
Whether a multiple lift of pre-cast concrete members is permissible.
6
01/25/2006
- 1926.753 -
OSHA requirements applicable to use of the Contex "Magic Arm" below-the-hook lifting device.
7
01/10/2006
- 1926.753 -
Requirement for a safety latch on a sling hook depends on the activity for which the sling is being used.
8
03/04/2004 - 1926.753(d) - Wire rope clips on suspension scaffolds; safety latches on large crane hooks; order of assembly for hanging scaffolds; and horizontal lifeline design.
9
11/08/2002 - 1926.753(c)(5) - Applicability of the steel erection standard to repair and installation of metal roofing and roofing accessories.
10
12/21/2001
- 1926.753 -
Decision to release the new compliance directive for the steel erection standard in draft form.
11
09/27/2001
- 1926.753 -
History and background of the Steel Erection Final Rule.
12
09/18/2001 - 1926.753(d) - Fall protection requirements of various construction (1926) standards.
13
09/18/2001 - 1926.753(c)(2) - Fall protection requirements of various construction (1926) standards.
14
09/18/2001 - 1926.753(c)(1)(i) - Fall protection requirements of various construction (1926) standards.
15
04/25/2001 - 1926.753(a)(4) - Application of CPL 2-1.29, Interim Inspection Procedures during Communication Tower Construction Activities.
16
08/20/2000 - 1926.753(c) - Employees must be kept clear of suspended loads, including multiple lift loads.