# Directives
1 - National - CPL 02-00-035 [CPL 2.35 CH-18] - Changes to the Regulatory General Industry Standard Alleged Violation
# Regulations
1 - 1910.335 - Safeguards for personnel protection.
# Settlement Agreement
1 - Industry Settlement Agreement - Edison Electric Institute - 02/13/2015
2 - Corporate-Wide Settlement Agreement - USPS - 06/28/2013
# Standard Interpretations
1 - 1910.335 - 29 CFR 1910.269 and 29 CFR Part 1926, Subpart V-Enforcement dates
2 - 1910.335 - Clarification of the applicability of 29 CFR 1910.269 to line-clearance tree trimming
3 - 1910.335 - Whether use of personal protective equipment is mandatory when working under heat stress conditions.
4 - 1910.335 - OSHA requirements for warning signs and protection from electric-arc-flash hazards and compliance with NFPA 70E-2004.
5 - 1910.335 - Clarification about 29 CFR 1910.333 and 29 CFR 1910.147 as they relate to work inside an electrical panel and on related equipment.
6 - 1910.335 - OSHA does not enforce NFPA 70E, although it may use NFPA 70E to support citations relating to certain OSHA standards.
7 - 1910.335 - Relevance of NFPA 70E industry consensus standard to OSHA requirements; whether OSHA requirements apply to owners.
8 - 1910.335 - Letter requesting interpretation of the OSHA electrical standards as they apply to employees using insulated hand tools.
9 - 1910.335 - Minimally acceptable levels of illumination; Resistor banks on overhead cranes; Overhead lines; Protective gloves on energized equipment.
10 - 1910.335 - Use of general protective equipment and tools by employees when working near exposed energized conductors or circuit parts in the workplace.
11 - 1910.335 - Applicability of the new Electrical Safety final rule, Subpart S, to the construction industry