1
|
- 1910.269(l)(1)(i) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines.
|
2
|
- 1910.269(l)(1)(i) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
|
3
|
- 1910.269(l)(1)(i) - Minimum number of employees required for performing electric power work conducted from bucket trucks.
|
4
|
- 1910.269(l)(1)(i) - Clarification of qualified employee requirements for the Electric Power Generation, Transmission, and Distribution standard.
|
5
|
- 1910.269(l)(1)(i) - Two employees must be present during work on energized systems >600 volts
|