1
08/05/2015
- 1910.147(c) -
Lockout/tagout of electrical hazards by workers who install, maintain, repair or replace premises wiring systems.
2
07/01/2015 - 1910.147(c)(7) - Lockout/tagout requirements during maintenance of front-end loaders (Jeff Wilke/DEP/GIE/Harvey/26485)
3
04/28/2010
- 1910.147(c) -
OSHA Training Standards Policy Statements
4
04/23/2007 - 1910.147(c)(7)(iii)(B) - Application of Control of Hazardous Energy (LOTO) requirements to compressed gas cylinders.
5
04/23/2007 - 1910.147(c)(7)(iii)(A) - Application of Control of Hazardous Energy (LOTO) requirements to compressed gas cylinders.
6
04/23/2007 - 1910.147(c)(7) - Application of Control of Hazardous Energy (LOTO) requirements to compressed gas cylinders.
7
04/17/2007 - 1910.147(c)(7)(i) - OSHA training Standards Policy Statement.
8
10/11/2006 - 1910.147(c)(5)(ii) - Use of LOTO device on equipment placed in "out of service" status not related to servicing or maintenance.
9
07/12/2006 - 1910.147(c)(4)(ii) - PSM compliance for ammonia refrigeration systems.
10
05/09/2006 - 1910.147(c)(4)(i) - Use of additional lock on a conveyor and baler system exceeds one lockout device.
11
10/24/2005 - 1910.147(c)(7)(i) - Training programs for the Control of Hazardous Energy (LOTO) and for the Hazard Communication standard are not satisfied solely by merely providing employees written documentation.
12
05/10/2005 - 1910.147(c)(7)(iv) - Hazardous energy control lockout/tagout (LOTO) program documentation and certification requirements.
13
05/10/2005 - 1910.147(c)(7) - Hazardous energy control lockout/tagout (LOTO) program documentation and certification requirements.
14
05/10/2005 - 1910.147(c)(6) - Hazardous energy control lockout/tagout (LOTO) program documentation and certification requirements.
15
05/10/2005 - 1910.147(c)(5) - Hazardous energy control lockout/tagout (LOTO) program documentation and certification requirements.
16
05/10/2005 - 1910.147(c)(4) - Hazardous energy control lockout/tagout (LOTO) program documentation and certification requirements.
17
05/10/2005
- 1910.147(c), 1910.147(c)(4), 1910.147(c)(5), 1910.147(c)(6), 1910.147(c)(7), 1910.147(c)(7)(iv) -
Hazardous energy control lockout/tagout (LOTO) program documentation and certification requirements.
18
12/07/2004 - 1910.147(c)(5) - LOTO: Use of heavy-duty nylon cable ties as lockout devices in lieu of chains and locks.
19
12/07/2004 - 1910.147(c)(3) - LOTO: Use of heavy-duty nylon cable ties as lockout devices in lieu of chains and locks.
20
12/07/2004 - 1910.147(c)(5)(i) - LOTO: Use of heavy-duty nylon cable ties as lockout devices in lieu of chains and locks.
21
11/10/2004 - 1910.147(c)(4)(ii) - Recognition of ANSI/ASSE Z244.1 "Control of Hazardous Energy - Lockout/Tagout and Alternative Methods" consensus standard
22
03/09/2004 - 1910.147(c)(7)(iv) - Lock out/Tag out periodic inspection requirements.
23
03/09/2004 - 1910.147(c)(7)(iii) - Lock out/Tag out periodic inspection requirements.
24
03/09/2004 - 1910.147(c)(6)(i)(D) - Lock out/Tag out periodic inspection requirements.
25
03/09/2004 - 1910.147(c)(6)(i)(C) - Lock out/Tag out periodic inspection requirements.
26
03/09/2004 - 1910.147(c)(6)(i)(B) - Lock out/Tag out periodic inspection requirements.
27
03/09/2004 - 1910.147(c)(6)(i) - Lock out/Tag out periodic inspection requirements.
28
03/09/2004 - 1910.147(c)(6) - Lock out/Tag out periodic inspection requirements.
29
02/10/2004 - 1910.147(c)(7)(i) - Clarification of "authorized" and "affected" employees and proper energy control procedures.
30
02/10/2004 - 1910.147(c)(4) - Clarification of "authorized" and "affected" employees and proper energy control procedures.
31
07/15/2003 - 1910.147(c)(1) - Motor-control-circuit switches and relays are prohibited from being used as energy isolating devices.
32
05/13/2003 - 1910.147(c)(2)(iii) - Acceptability of modifying a standard on/off switch to provide lockout capability to a machine.
33
05/13/2003 - 1910.147(c)(3) - Acceptability of modifying a standard on/off switch to provide lockout capability to a machine.
34
01/14/2003 - 1910.147(c)(4)(ii) - Requirements for developing sufficiently-detailed written procedures for all machinery/equipment lockout/tagout.
35
08/30/2002 - 1910.147(c)(5)(ii)(B) - Color is not the only prescribed factor for the standardization of LOTO devices.
36
07/08/2002 - 1910.147(c)(5) - Use of verification tags for lockout.
37
06/24/2002 - 1910.147(c)(5) - Guidance on approval requirments for general circuit breaker panel swich lockouts in General Industry.
38
01/29/2002 - 1910.147(c)(2) - Authorized employees must have the opportunity to verify energy isolation in group lockout/tagout
39
04/06/2001 - 1910.147(c)(7) - Required components of a LOTO inspection.
40
04/06/2001 - 1910.147(c)(6) - Required components of a LOTO inspection.
41
06/28/2000 - 1910.147(c)(5) - "Approval" of flexible corrugated plastic covers and generic circuit breaker panel switch lockouts.
42
04/11/2000 - 1910.147(c)(4)(i) - Energy control procedures must be developed unless eight conditions met.
43
03/22/2000 - 1910.147(c)(3) - Lockout/tagout: preferred means of energy isolation; non cord-and-plug powered equipment.
44
12/16/1999 - 1910.147(c)(1) - Use of Monitored Power Systems for lockout/tagout.
45
11/03/1999 - 1910.147(c)(1) - Use of "generic" LOTO procedures in conjunction with "work authorization permits".
46
03/16/1998 - 1910.147(c)(5)(ii)(D) - Identity of employee applying lockout and tagout devices.
47
01/11/1996 - 1910.147(c)(4)(i) - Permit-required confined spaces and control of hazardous energy; vehicle LOTO.
48
08/12/1994 - 1910.147(c)(4) - Lockout/tagout procedures, including work permits and groups of machines/equipment.
49
03/08/1991 - 1910.147(c)(2)(iii) - The obligations and responsibilities of machine manufacturers under the lockout/tagout standard.