For problems with accessibility in using figures and illustrations, please contact the DOC at 202-693-2020.

Investigation of the October 10, 2012 Parking Garage Collapse during Construction at Miami Dade College, Doral, FL

A portion of the parking garage under construction suddenly collapsed, trapping and killing four employees and injuring three others. The six-story garage was 305 ft. x 390 ft., and 62 ft. high and was being constructed with precast concrete structural members. The collapse occurred over an area of 122 ft. by 132 ft. The heavy fallen concrete pieces weighed approximately 3,300 tons. Back to Top