For problems with accessibility in using figures and illustrations, please contact the DOC at 202-693-2020.
Investigation of the December 19, 2008 Collapse of Atlanta Botanical Garden Canopy Walkway during Construction in Atlanta, GA
A spirally shaped pedestrian walkway steel bridge approximately 575' long and 11' to 18' wide under construction collapsed. At the time of the incident, concrete was being poured over the bridge deck. The collapse was massive, involving over seventy percent of the bridge. At the time of the collapse, the entire bridge structural frame was being supported over fifteen temporary shoring towers. One worker killed, 18 injured.
Back to Top