# Standard Interpretations
1 - 1926.757 - Interpretation of OSHA standard CFR 1926.757(a)(1) concerning the angle created by two members framing into a column
2 - 1926.757 - Field-bolted joist requirements for solid web structural steel members.
3 - 1926.757 - Acceptability of using extensible boom forklifts to lift steel joist for spreading by hand
4 - 1926.757 - Field bolting and welding requirements for steel joist assembly
5 - 1926.757 - Decision to release the new compliance directive for the steel erection standard in draft form.
6 - 1926.757 - History and background of the Steel Erection Final Rule.
7 - 1926.757(a)(1) - Field-bolted joist requirements for solid web structural steel members.
8 - 1926.757(a)(1) - Interpretation of OSHA standard CFR 1926.757(a)(1) concerning the angle created by two members framing into a column
9 - 1926.757(a)(4) - Applicability of the steel erection standard to repair and installation of metal roofing and roofing accessories.
10 - 1926.757(e)(4) - Applicability of the steel erection standard to repair and installation of metal roofing and roofing accessories.
11 - 1926.757(a)(8) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R.
12 - 1926.757(a)(8)(i) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R.
13 - 1926.757(a)(8)(ii) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R.
14 - 1926.757(b)(1) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R.
15 - 1926.757(b)(2) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R.
16 - 1926.757(c)(2) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R.
17 - 1926.757(b) - Field bolting and welding requirements for steel joist assembly
18 - 1926.757(b)(1) - Field bolting and welding requirements for steel joist assembly
19 - 1926.757(b)(2) - Field bolting and welding requirements for steel joist assembly
20 - 1926.757(b)(3) - Field bolting and welding requirements for steel joist assembly
21 - 1926.757(a)(8) - Field bolting and welding requirements for steel joist assembly
22 - 1926.757(c)(1) - Field bolting and welding requirements for steel joist assembly
23 - 1926.757(c)(2) - Field bolting and welding requirements for steel joist assembly
24 - 1926.757(a)(8)(i) - Field bolting and welding requirements for steel joist assembly
25 - 1926.757(a)(8)(ii) - Field bolting and welding requirements for steel joist assembly
26 - 1926.757(a)(8) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting.
27 - 1926.757(a)(8)(i) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting.
28 - 1926.757(a)(8)(ii) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting.
29 - 1926.757(b)(3) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting.
30 - 1926.757(c)(2) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting.
31 - 1926.757(a)(9) - Fall protection requirements of various construction (1926) standards.
32 - 1926.757(c)(3) - Corrected Tables A and B for 1926 Subpart R, the Steel Erection Standard.