Lapse in Appropriations
For workplace safety and health, please call 800-321-6742; for mine safety and health, please call 800-746-1553; for Job Corps, please call 800-733-5627 and for Wage and Hour, please call 866-487-9243 (866-4-US-WAGE). This website is currently not being updated due to the suspension of Federal government services. The last update to the site was 10/1/2025. Updates to the site will start again when the Federal government resumes operations.
| # | Letters of Interpretation |
|---|---|
| 1 | - 1926.757(b)(3) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting. |
| 2 | - 1926.757(b)(3) - Field bolting and welding requirements for steel joist assembly |
| 3 | - 1926.757(b)(2) - Field bolting and welding requirements for steel joist assembly |
| 4 | - 1926.757(b)(1) - Field bolting and welding requirements for steel joist assembly |
| 5 | - 1926.757(b), 1926.757(b)(1), 1926.757(b)(2), 1926.757(b)(3) - Field bolting and welding requirements for steel joist assembly |
| 6 | - 1926.757(b)(2) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. |
| 7 | - 1926.757(b)(1) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. |