# | Regulations |
---|---|
1 | - - Asbestos. |
# | Standard Interpretations |
---|---|
1 | - 1926.1101(g)(8) - Engineering controls for removal of asbestos-containing construction mastic (Class II work operations). |
2 | - 1926.1101(g)(8) - Use of electric floor buffer with rotating blade attachment to remove asbestos-containing mastic. |