# Letters of Interpretation
1 - 1926.1101(g)(2) - Drywall replacement after removing water damaged asbestos-containing materials (ACM)
2 - 1926.1101(g)(2)(ii) - The use of "pipe cases" manufactured by Therm-Equip, Inc., in lieu of standard glove bags.
# Regulations
1 - - Asbestos.