1
06/26/2007 - 1910.269(d)(8)(ii)(D) - Clarification of LOTO procedures for servicing and maintenance of wind turbines.
2
07/20/2006 - 1910.269(d)(8)(i) - Clarification of supervisor accessibility to individual field-lock keys in a group lock box under 1910.269.
3
07/20/2006
- 1910.269(d)(8), 1910.269(d)(8)(i) -
Clarification of supervisor accessibility to individual field-lock keys in a group lock box under 1910.269.
4
07/19/2006 - 1910.269(d)(8)(i)(A) - Group LOTO and supervisor's accessibility to individual employee lock when employee is not available to remove lock.
5
07/19/2006 - 1910.269(d)(8)(i) - Group LOTO and supervisor's accessibility to individual employee lock when employee is not available to remove lock.
6
07/19/2006
- 1910.269(d)(8), 1910.269(d)(8)(i), 1910.269(d)(8)(i)(A) -
Group LOTO and supervisor's accessibility to individual employee lock when employee is not available to remove lock.
7
09/28/2005 - 1910.269(d)(8)(ii)(D) - Request for formal review of Exelon Generating Corporation's energy control procedure.
8
09/28/2005 - 1910.269(d)(8)(ii) - Request for formal review of Exelon Generating Corporation's energy control procedure.
9
06/13/2003 - 1910.269(d)(8)(v) - Response to Exelon Generation's concerns regarding draft Instruction CPL 2-1.18A, "Enforcement of the Electric Power Generation, Transmission and Distribution Standard."
10
06/13/2003 - 1910.269(d)(8)(v) - Response to Edison Electric Institute's concerns regarding draft Instruction CPL 2-1.18A, "Enforcement of the Electric Power Generation, Transmission and Distribution Standard."
11
11/21/2000 - 1910.269(d)(8)(v) - Clarification of system operator exclusive control provisions.
12
11/21/2000 - 1910.269(d)(8)(ii) - Clarification of system operator exclusive control provisions.