# Standard Interpretations
1 - 1910.119(a) - Storage of pre-charged air conditioners and heat pumps in warehouses or distribution centers
2 - 1910.119(a) - OSHA PSM and Explosives Standards as They Relate to the DOT Classification "Not in the Explosive Class"
3 - 1910.119(a) - PSM and Aerosol (Flammable Gas) Containers Stored in Warehouses/Distribution Centers
4 - 1910.119(a) - Production facilities that recover natural gas liquids may have enforceable PSM-covered processes
5 - 1910.119(a)(2)(i) - PSM Retail Exemption Enforcement Delay Notice
6 - 1910.119(a)(1)(ii) - PSM for pharmaceutical plant
7 - 1910.119(a)(1)(ii) - Determining when a mixture would exceed the threshold quantity in a covered process.
8 - 1910.119(a)(2)(ii) - Extent of OSHA's jurisdiction over worksites involving geological and underground storage facilities for gas and hazardous liquids.
9 - 1910.119(a)(1)(ii)(B) - Riggs – PSM Coverage of Biodiesel Facilities
10 - 1910.119(a)(1)(ii) - PSM coverage of utility systems; whether 1910.269 preempts the PSM standard for power generation facilities that serve covered processes.
11 - 1910.119(a)(1)(i) - PSM coverage of utility systems; whether 1910.269 preempts the PSM standard for power generation facilities that serve covered processes.
12 - 1910.119(a)(2)(i) - Clarification of the retail facilities exemption under the PSM standard.
13 - 1910.119(a)(1)(ii)(B) - OSHA enforcement policy of the PSM standard distilleries and related facilities in SIC 2085.
14 - 1910.119(a)(1)(ii)(B) - Clarification of PSM applicability to processes that are based partly or solely on quantities in connected atmospheric storage tanks.
15 - 1910.119(a)(1)(ii)(B) - PSM applicability to warehousing flammable liquids and other HHCs.
16 - 1910.119(a)(2)(i) - Retailer exemption from the PSM standard for anhydrous ammonia dealers.
17 - 1910.119(a)(1)(ii)(A) - Thomas' MAPP gas glass mold heat processes fall within the PSM hydrocarbon fuels exemption.
18 - 1910.119(a)(1) - Applicability of PSM standard to on-site use of methane as fuel.
19 - 1910.119(a) - OSHA will not enforce the PSM standard at oil and gas production facilities.
20 - 1910.119(a) - Process Safety Management (PSM) applicability to liquid petroleum gas (LPG) bottle filling process.
21 - 1910.119(a) - PSM coverage of oil and gas production and separation facilities.
22 - 1910.119(a)(1) - PSM standard applicability to a table glassware manufacturing process.
23 - 1910.119(a) - PSM coverage of oil and gas production and separation facilities.
24 - 1910.119(a)(1)(ii)(B) - Applicability of the PSM standard to a flammable liquid manufacturing process.
25 - 1910.119(a) - PSM applicability to a 50% Solution of Hydroxylamine.
26 - 1910.119(a)(2)(iii) - PSM Standard exemption for "normally unoccupied remote facilites" (water treatment plant).
27 - 1910.119(a)(1)(ii)(B) - Coverage of Stored Flammables Under the Process Safety Management Standard.
28 - 1910.119(a)(1)(ii)(B) - Applicability of the PSM standard to storage and transfer of flammable liquids.
29 - 1910.119(a) - Application of Process Safety Management of Highly Hazardous Chemicals to the manufacture of explosives and pyrotechnics.