Reinhart Construction and S.M. Wilson Promotes Safety and Health during the construction of the Boone Hospital Patient Tower
Background:
On September 26, 2008, Reinhart Construction Company and S.M. Wilson, in a joint venture,
formed an OSHA Strategic Partnership (OSP) with OSHA's Region VII, Kansas City Area Office,
to reduce occupational fatalities and serious injuries. The primary purpose of the OSP is to
create a working relationship that will allow participants to promote safety and health during the
construction of the new Boone Hospital Patient Tower Project. The goals of the OSP were: to
provide a safe and healthful environment for employees involved in the project; to help prevent
serious accidents and fatalities by addressing the primary four hazards in the construction
industry (falls, struck-by, electrocution, and caught-in-between) through increased training; to
establish a system to collect and analyze injury and illness trends by all contractors working at
the site; to recognize employers that develop and implement safety and health management
programs that include a jobsite inspection program; to implement a fall protection plan for work
being perform above six feet; and to maintain a lost time incident rate below the Bureau of Labor
Statistics (BLS) average rate for the construction industry. The OSP is supported by the Board of
Directors for the Boone County Hospital.
Success Impact:
Increased Safety Training and Improved Safety and Health Management Programs Lead to
Reduced Injury and Illness Rates
Increased training was a key component of the OSP. More than 5,600 employees received
approximately 6,084 hours of training on topics including: site safety orientation, occupational
stress, respiratory protection, electrical hazards, excavation/trenching safety, fall protection,
scaffolding safety, and crane safety. The managers on site received the OSHA 30-hour Outreach
Construction course and training on supervisory accountability.
The participants developed strategies to improve for safety and health management programs.
One strategy was to include workers who had been involved in a safety infraction in the
development of processes and programs to eliminate similar hazardous behavior. This practice
was a positive enhancement to their disciplinary program, encouraged workers to become more
involved in hazardous behavior analysis, and replaced the practice of removing employees
involved in safety infractions from the site. This practice also encouraged workers to report
injuries and illnesses without the fear of being removed from the job site.
During the project, the site experienced six OSHA Recordable incidents for a Total Case Incident
Rate (TCIR) of 2.15 (or 40% below) the 2009 Bureau of Labor Statistics (BLS) National Average
TCIR of 3.6 for NACIS 2362. The project's total Days Away, Restricted, and Transferred (DART)
rate of 0.36 and the Days Away from Work (DAFW) rate of 0.36 were respectively 79% and 60%
below the 2009 BLS National Average DART and DAFW for NACIS 2362.
| Year |
Hours |
Total Cases |
TCIR |
# of DART Cases |
DART RATE |
# Days Away Activity |
DAFW RATE |
9/26/2008 to 11/2/2009 |
59,270 |
2 |
6.75 |
0 |
0.0 |
0 |
0.0 |
| 11/3/09- 12/31/10 |
319,419 |
1 |
0.63 |
0 |
0.0 |
0 |
0.0 |
| 1/1/11-6/1/11 |
179,825 |
3 |
3.34 |
1 |
1.11 |
1 |
1.11 |
| Total |
558,514 |
6 |
2.15 |
1 |
0.36 |
1 |
0.36 |
| 2008 BLS National Average for NAICS 2362 |
|
|
3.6 |
|
1.7 |
|
0.9 |
| Percentage Difference From BLS Average |
|
|
-40% |
|
-79% |
|
-60% |
Partnership Objectives:
The key objectives of the OSP were to: maintain a lost time incidence rate below the BLS national
average, non-fatal lost time incidence rate; conduct frequent jobsite inspections and abate
hazards identified, ensure all employees receive adequate safety and health training; implement
a fall protection plan where work was being performed six feet or more above a lower surface;
and require all contractors and subcontractors to develop and implement safety and health
management systems.
Origin: Region VII, Kansas City Area Office
Partners: Reinhardt/Wilson Joint Venture, Boone County Hospital
Partnership Signed: September 26, 2008
Industry (NAICS Code): Nonresidential building construction (2362)
Employees: Average of 215 workers on site at any given point; total number of workers on site was 5628
Employers: 31
Source/Date: Jacalyn Wheeler, Safety and Health Program Manager, OSHA, Region VII