TEXT VERSION OF SLIDE:
Title: BEFORE/AFTER
Type: Text Slide with Images
Content:
COST: $25,000
COST RECOVERY TIME: 6 months
BENEFITS: Eliminated strains from reaching & lifting. Reduced exposure to burns and increased
productivity.
| Perm Mold |
Position |
Frequency |
Twisting |
Grasp |
Opinion |
Total |
| Remove Casting |
Weight |
Deg |
Freq |
Grip |
Foot |
| Before |
8 |
8 |
4 |
2 |
0 |
4 |
8 |
8 |
42 |
| After |
2 |
6 |
2 |
0 |
0 |
2 |
2 |
2 |
16 |
[Includes two photos; one of a worker using a hand clamp to remove casting from die; and one of a worker using a robotic arm to remove casting from die]
|