TEXT VERSION OF SLIDE:
Title: BEFORE/AFTER
Type: Text Slide with Images
Content:
COST: $25,000
COST RECOVERY TIME: 8-12 months
BENEFITS: Eliminated strains from bending & lifting and burns, reduced silica exposure
| Shakeout |
Position |
Frequency |
Twisting |
Grasp |
Opinion |
Total |
|
Weight |
Deg |
Freq |
Grip |
Foot |
| Before |
8 |
8 |
6 |
2 |
6 |
4 |
4 |
6 |
44 |
| After |
2 |
2 |
0 |
2 |
0 |
2 |
2 |
4 |
14 |
[Includes two photos; one of a worker manually removing casting from shakeout, and one of a worker using a robotic arm to move castings into basket]
|