Slide 39

    TEXT VERSION OF SLIDE:

    Title: BEFORE/AFTER
    Type: Text Slide with Images
    Content:

    COST: $35,000
    COST RECOVERY TIME: Six months
    BENEFITS: Eliminated burns, shoulder and back injuries, and manpower. Increased production.

    Hunter/DISA Position Frequency Twisting Grasp Opinion Total
    Pourer Weight Deg Freq Grip Foot
    Before 8 8 4 0 6 4 8 8 46
    After 0 0 0 0 0 0 0 0 0

    [Includes two photos; one of two workers manually pouring a mold; and on eof an automatic pouring machine]