    TEXT VERSION OF SLIDE:

    Title: BEFORE/AFTER
    Type: Text Slide with Images
    Content:

    COST: $5000
    COST RECOVERY TIME: Three to six months.
    BENEFITS: Eliminated all shoulder and back injuries and burns. Reduced cycle times and fatigue which increased production.

    Perm Mold Position Frequency Twisting Grasp Opinion Total
    Hydraulic Pourer Weight Deg Freq Grip Foot
    Before 8 8 4 0 6 4 8 8 46
    After 0 2 0 0 0 0 2 2 6

    [Includes two photos; one of a worker manually pouring aluminum into a mold, and one of a worker using a suspended ladle to pour aluminum into a mold]