TEXT VERSION OF SLIDE:
Title: BEFORE/AFTER
Type: Text Slide with Images
Content:
COST: $5000
COST RECOVERY TIME: Three to six months.
BENEFITS: Eliminated all shoulder and back injuries and burns. Reduced cycle times and fatigue
which increased production.
| Perm Mold |
Position |
Frequency |
Twisting |
Grasp |
Opinion |
Total |
| Hydraulic Pourer |
Weight |
Deg |
Freq |
Grip |
Foot |
| Before |
8 |
8 |
4 |
0 |
6 |
4 |
8 |
8 |
46 |
| After |
0 |
2 |
0 |
0 |
0 |
0 |
2 |
2 |
6 |
[Includes two photos; one of a worker manually pouring aluminum into a mold, and one of a worker using a suspended ladle to pour aluminum into a mold]
|