TEXT VERSION OF SLIDE:
Title: BEFORE/AFTER
Type: Text Slide with Images
Content:
COST: $176,000
COST RECOVERY TIME: 6-12 months
BENEFITS: Eliminated strain from repetition and force, increased productivity and reduced manpower
|
Movement |
Position |
Force/ Grip |
Vibration |
Environ-ment |
Opinion |
Total |
| Finishing Dept. Sanding |
Arm |
Twist |
Wrist |
Finger |
Head |
Back |
Elbow
(fwd) |
Elbow
(side) |
Forearm |
Wrist |
Before |
4 |
4 |
6 |
2 |
8 |
2 |
0 |
0 |
6 |
4 |
2 |
8 |
4 |
4 |
54 |
After |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
[Includes two photos; one of a worker sanding a casting, and one of a robotic arm being used to sand a casting]
|