Aurora Police Station and Branch Court Facility Partnership Meets All Goals During Year One
Background:
In January 2008, the Aurora Police Station and Branch Court Facility OSHA
Strategic Partnership (OSP) was formed with partners Leopardo Construction, R.C.
Wegman Construction Company, the Illinois Onsite Safety and Health Consultation
Program, and OSHA’s Aurora Area Office. The main objective of the OSP is to
promote safety and health during the construction of the $70 million Aurora
Police Headquarters and Branch Court Facility. This new facility will include
flat concrete floors, structural steel and metal deck framing system, pre-cast
wall panels, and office space. Approximately 26 employers and 187 employees are
covered by the OSP. The facility is expected to be completed in October 2009.
The OSP submitted their first annual evaluation in the spring of 2009.
Success Impact:
OSP Meets all Goals During First Year: Maintaining Injury and Illness Rates 15% below the National Average, Improving Safety and Health Management Systems in the Industry, and Increasing Safety and Health Training
During the first year of the OSP, 60 training sessions and 3,268 training hours
were conducted which resulted in 615 employees, managers, and supervisors
completing safety and health training. The training included topics on traffic
control and fall harness and personal protective equipment, as well as OSHA
30-hour courses.
To be accepted into the OSP, every participant was required to implement a
site-specific safety and health management system which was reviewed prior to
commencing work to ensure it covered all key industry hazards. Fourteen OSP
meetings were held to discuss work on the project which also included conducting
an onsite non-enforcement inspection. These verifications resulted in very few
issues, and those that were observed were quickly resolved. Also, daily and
comprehensive monthly self-inspections were conducted on a regular basis which
resulted in 1,201 hazards or serious violations being identified and
corrected/abated.
The OSP’s Days Away, Restricted or Transferred (DART) rate was 1.5 which is 67
percent below the 2007 Bureau of Labor Statistics’ (BLS) national average. The
OSP’s Total Case Incident Rate (TCIR) was also 1.5 which is 29 percent below BLS.
The below table presents the OSP’s injury and illness rates compared to the BLS
national average during its first year:
| |
DART |
TCIR |
OSP Rates (Year 1) |
1.5 |
1.5 |
| BLS Industry National Average (2007) |
2.1 |
4.5 |
| Percentage Below BLS |
-67% |
-29% |
By implementing key strategies to meet its key goals, the OSP has
demonstrated outstanding results. Other OSP benefits as reported in the annual
evaluation included increased safety and health awareness and improved
relationships between OSHA, employees and unions, and employers.
Partnership Objectives:
Key objectives of the OSP are to: reduce injuries and illnesses by implementing
a comprehensive job site inspection program; maintain injury and illness rates
that are 15 percent below the BLS national average; increase the number of
employees, employers, and supervisors who have completed safety and health
training.
Origin: Aurora Area Office (Region V)
Partners: Leopardo Construction, R.C. Wegman Construction Company, and
Illinois Onsite Safety and Health Consultation Program
Partnership Signed: January 29, 2008
Industry (NAICS Code): Construction (236220)
Employees: 187
Employers: 26
Source/Date: Nancy M. Quick, Aurora Area Office (Region v) and Danielle
Gibbs, OSHA National Office (Washington, DC)/July 2009
Page last updated: 02/26/2010