Slide 33

    TEXT VERSION OF SLIDE:

    Title: This did not start this way
    Type: Text Slide
    Content:
    • Prior to April of 1999 the Miller Park project was at 27% of premium dollars for injuries at the site.

    • As the need to accelerate the production to make the opening day deadline, a dispute over site arose and the then safety director left.

    • In the next few months there were serious falls, dropped loads and the death of three workers.

 
Back to Top Back to Top www.osha.gov www.dol.gov

Contact Us | Freedom of Information Act | Customer Survey
Privacy and Security Statement | Disclaimers
Occupational Safety & Health Administration
200 Constitution Avenue, NW
Washington, DC 20210